

Shower remodels
Shower remodeling
A tiled shower that stays dry behind the tile, which is where most leaks begin.

A waterproof membrane and a pan that slopes the right way to the drain. That layer decides whether the wall rots in ten years.
A frameless panel or door is measured once the tile is set, so it usually arrives about a week after.
- 01Niche
A recessed shelf for bottles, framed into an inside wall before the tile goes up.
- 02Bench
A seat framed in solid or one that floats on hidden brackets. Both need blocking before tile.
- 03Mixing valve
A pressure balancing valve holds the temperature steady when someone flushes.
In the price tool
Price it, then design it
- 01The price, split into lines
Demo, flooring, fixtures, the vanity, wiring and plumbing sit on separate lines, each priced from what Cincinnati area trades earn.
- 02Start from the bathroom you have
Primary bath, tub with a shower, walk in shower or powder room. Tap whichever one is nearest to yours.
- 03Then design it in 3D
Set the shower glass, the wall tile and the fixture finish, then open the full room view.
Shower remodels
Shower remodels questions
How long does a shower remodel take?
Usually 1 to 2 weeks of work, then about a week of waiting for the glass.
Can I keep the drain in the same spot?
Yes, and that keeps the price down. Relocating it means cutting into the floor.
Is a permit needed for a shower remodel?
When plumbing is added or the drain moves, yes. Your contractor files for it.
Also in a bathroom
Related services
No visit needed
Price it with your own picks
Vanity, tile, glass and finish. The number follows every choice.


