

About
The number first, the visit later
An independent bathroom remodeling service for homes across Warren County.
- The price comes first
Added up from what Cincinnati area trades are paid, today's material prices, permit fees and a normal margin.
- You design the room
Set the vanity, glass, tile and finish in 3D and look at the whole bathroom before anything is ordered.
- Licensed pros build it
A licensed local contractor confirms the number and does the work.
Why the price comes first
Bathroom quotes that never agree
Get three contractors to quote the same bathroom and you will see three unrelated numbers. One is about half of the rest. Another is 20% above them. None of them say why.
A lot of bathroom quotes are a figure that feels right, or a sheet that went out to four other houses that week. Pricing one properly means checking what tile setters, plumbers and electricians earn here today, then adding the tile, vanity, glass and fixtures you chose. That takes hours, so it gets skipped.
We put in those hours. The price tool adds up your bathroom one line at a time from Cincinnati area wages, current material prices and permit fees, and it shows you every line. The number is fair to you and fair to whoever does the work.
One bathroom, three numbers
How it works
From a number to a finished bathroom
- 01
Roughly sixty seconds
Your number
Tell the tool roughly how big the room is and what is changing: the shower, the tub, the vanity, tile, toilet or lighting. Type in the ZIP code. You get three finish levels, each split into lines built from Cincinnati area trade wages.
- 02
Five minutes or so
Build it on screen
Pick the room closest to yours, from a walk in shower to a powder room. Choose the vanity color, the shower glass, the wall tile and the fixture finish, then look at the whole room from every side.
- 03
Only on your request
Get it confirmed
A licensed local contractor comes out, measures, checks the subfloor, the drain and what sits behind the old tile, and confirms the number. That visit happens on your request and not before.
- 04
2 to 4 weeks of work
Build it
Permits get pulled and the vanity, tile and fixtures get ordered. A bathroom that keeps its layout is usually 2 to 4 weeks of work once it starts. Shower glass is measured after the tile is set, so it goes in last.
No visit needed
See your bathroom price
Sixty seconds from your ZIP code to a priced bathroom you can turn around in 3D.