

Powder rooms
Powder room remodeling
A small room where the finishes do all the talking.

The vanity, toilet, mirror, light, floor and often one bold wall of tile or paper.
No shower or tub means no waterproofing, so most are finished in days.
- 01Toilet on the wall
Saves floor space but needs a carrier inside the wall.
- 02Light
Two sconces flanking the mirror light a face better than one fixture above it.
- 03Narrow vanity
A shallow or floating vanity leaves room for the door to swing.
In the price tool
Price it, then design it
- 01The price, split into lines
Demo, flooring, fixtures, the vanity, wiring and plumbing sit on separate lines, each priced from what Cincinnati area trades earn.
- 02Start from the bathroom you have
Primary bath, tub with a shower, walk in shower or powder room. Tap whichever one is nearest to yours.
- 03Then design it in 3D
Set the shower glass, the wall tile and the fixture finish, then open the full room view.
Powder rooms
Powder rooms questions
How many days does a powder room take?
Three to five days is typical.
Will a powder room need a permit?
A like for like swap does not. Moving the toilet or adding a circuit does.
Can a closet become a powder room?
Usually, as long as a drain line can get there.
No visit needed
Price it with your own picks
Vanity, tile, glass and finish. The number follows every choice.


