

Bathroom services
Nine bathroom jobs, one price tool
Pick what your bathroom needs, price it all together and see the room in 3D.
Point at a tile
Every service, with a photo
Each tile opens a page on what the work involves, how long it takes and what people ask about it.
Shower remodelsTiled showers with glass, a niche and a pan sloped to the drain.See shower remodels
Tub to showerPull the tub nobody bathes in and put a walk in shower in its place.See tub to shower
BathtubsAlcove, soaking or freestanding tubs, with the walls around them redone.See bathtubs
VanitiesSingle or double vanities, stone tops, sinks and mirrors.See vanities
TileFloor tile, shower walls and a wall that carries the room.See tile
Powder roomsThe small bath guests see first. Little room, big change.See powder rooms
Accessible bathsCurbless showers, grab bars and fixtures at a comfortable height.See accessible baths
Lighting and fansMirror lights, recessed cans and a fan that clears the steam.See lighting and fans
Plumbing and fixturesToilets, faucets, valves and plumbing that moves.See plumbing and fixtures How it works
Four steps, at your pace
- 01
Roughly sixty seconds
Your number
Tell the tool roughly how big the room is and what is changing: the shower, the tub, the vanity, tile, toilet or lighting. Type in the ZIP code. You get three finish levels, each split into lines built from Cincinnati area trade wages.
- 02
Five minutes or so
Build it on screen
Pick the room closest to yours, from a walk in shower to a powder room. Choose the vanity color, the shower glass, the wall tile and the fixture finish, then look at the whole room from every side.
- 03
Only on your request
Get it confirmed
A licensed local contractor comes out, measures, checks the subfloor, the drain and what sits behind the old tile, and confirms the number. That visit happens on your request and not before.
- 04
2 to 4 weeks of work
Build it
Permits get pulled and the vanity, tile and fixtures get ordered. A bathroom that keeps its layout is usually 2 to 4 weeks of work once it starts. Shower glass is measured after the tile is set, so it goes in last.
No visit needed
Price the whole bathroom in one go
Choose what is part of the job and the number follows you.